    Progress that was not photographed at the phase boundary cannot be photographed later

    Nobody can go back and shoot last March. Progress capture is the one aerial product where the value is entirely in the interval, and the interval is set by the build schedule rather than by the marketing calendar.

    Scoped quote · NDA on request · Advanced RPAS certified · Reply within one business day

    Does Fly4MEdia work in construction and infrastructure?

    Yes. Fly4MEdia flies construction progress documentation across Alberta and British Columbia — repeat passes from fixed coordinates so a sequence reads as one continuous record. Airspace authorisation is filed where a site sits in controlled airspace, which covers most urban Alberta.

    What gets captured.

    Progress sequence

    The same frame, from the same coordinates and altitude, at agreed intervals. The sequence is the deliverable; a single frame is not.

    Earthworks and grading

    Cut, fill and drainage across the whole footprint at once — legible from directly overhead and almost invisible at ground level.

    Site logistics

    Laydown organisation, access routes, crane positioning and stockpile location as a measurable state rather than an impression.

    Milestone evidence

    Time-stamped documentation of what existed when — the record that settles a completion-percentage argument before it becomes a dispute.

    What actually constrains the work.

    • Most urban Alberta construction sits inside controlled airspace. Calgary sits under the CYYC control zone and the west side sits under Springbank, so authorisation is part of scheduling rather than an obstacle to it.
    • Interval is driven by the build schedule, not the calendar. A phase boundary that passes unphotographed is gone permanently.
    • Active sites have crane and personnel movement. Capture is planned around the work rather than requiring the site to stop.
    • Winter capture in Alberta gives better contrast on earthworks than midsummer, because snow cover reveals grade that green cover hides.

    The numbers a business case is built on.

    Every figure carries its publisher, its year and a live link. Where a number is an industry aggregate rather than a published study, it says so.

    • 30% more

      McKinsey research cited across the inspection sector finds that organisations relying on manual inspection spend materially more on maintenance and safety than those using drone-based assessment.

      For a portfolio of assets, the inspection method is a recurring cost line, not a one-off purchase. The differential compounds annually.

      Reported by McKinsey & Company, cited by Averroes, 2025

    • Up to 75% less time

      McKinsey & Company reports that drones can cut surveying time by up to three quarters against traditional ground methods — a three-day site survey completed inside one.

      On a consulting engagement billed by the day, survey duration is not a line item. It is the schedule.

      Reported by McKinsey & Company, cited by Datumate, 2025

    • Over $40,000

      The National Safety Council puts the average cost of a single workplace injury above forty thousand dollars, before any legal exposure.

      Aerial capture removes the requirement to put a person at height or in a confined space to obtain the same image. That is a risk transfer, not a convenience.

      Reported by National Safety Council, cited by DSLRPros, 2025

    • 40–60% lower

      Construction programmes adopting systematic drone survey report reductions of roughly half in surveying cost, alongside faster data collection.

      The saving is structural rather than one-off: it applies to every survey cycle across the life of the project.

      Reported by Datumate, 2025

    Who commissions this.

    • Project managers and site superintendents
    • Development and asset managers
    • Quantity surveyors and cost consultants
    • Prime consultants reporting to an owner

    Engagements are quoted against a written scope and can be invoiced to a prime consultant. Vendor onboarding, certification evidence and confidentiality posture are published rather than answered by email.

    What is delivered.

    • High-resolution stills, colour-managed
    • Edited video in the format the end use requires
    • Repeat-capture sequences for progress or condition monitoring
    • Raw files where the engagement calls for them

    Construction and infrastructure questions, answered.

    How often should a construction site be captured from the air?

    At phase boundaries rather than on a fixed monthly cycle. The interval is set from the build schedule at scoping, because the value of the sequence comes from capturing transitions — and a transition that passes undocumented cannot be recovered.

    Can aerial progress imagery be used in a payment dispute?

    It is commonly used as supporting evidence. What makes it defensible is provenance — a dated flight log recording where and when the aircraft flew, and a capture specification agreed before the shoot rather than reconstructed afterwards.

    Does the site need to stop work for an aerial capture?

    No. Capture is planned around active operations, with the flight path and timing agreed against the day's work. Stopping a site to photograph it would cost more than the imagery is worth.